Drawing Up Cost Estimate Documentation
Drawing up budget documentation.
- as a section of the project, with the seal of a certified design engineer in terms of estimate documentation;
- drawing up a consolidated estimate for a defective act;
- preparation of the contract price for participation in the tender or the conclusion of work contracts;
- preparation of acts of work performed;
- checking the estimate documentation with the seal of a certified design engineer in terms of the estimate documentation.